Process Heating Skid Systems for Contaminated Water TanksAn engineering firm needed freeze protection for eight large contaminated water tanks at a waste remediation site in the northern U.S. Winter was fast approaching and they needed a heating solution on-site within 2 to 3 weeks.The temperatures were dropping quickly and time was running out to get the tank heaters on site to prevent freezing. Durex’ engineering team swung into action with several electric heater design proposals. To save time, the customer chose to go with dual-stage circulation heaters & two-zone control panel skidded systems, which he would mate to his existing pumps and piping on site in order to service multiple contaminated water tanks. Working on an expedited schedule, within two weeks Durex Industries designed, built, tested and shipped the process-heating systems directly to the job site. The heaters were successfully installed, up and running prior to the first major freeze of the winter.
|